Analisis Pengaruh Faktor-Faktor Penyebab Rework terhadap Kualitas Kinerja Pelaksanaan Proyek Konstruksi Gedung di Kota Denpasar

Main Article Content

I Putu Widyarsana
Program Studi Sistem Informasi ITB STIKOM Bali
Putu Eny Suhardiyani
Program Studi Sistem Informasi ITB STIKOM Bali

Building construction is always undergoing rework. This can happen due to design errors, the application of work methods that are not in accordance with procedures, or lack of supervision during the construction process. In previous studies, the factors that cause rework include design, management, resources, and the environment. This study analyzes how these factors have an impact on the quality of performance in the implementation of construction projects. Construction projects in Denpasar City are the subject of quantitative and qualitative research. Data was collected through interviews, brainstorming, and questionnaires with experts. With the purposive sampling method, respondents are selected based on predetermined criteria. SmartPLS 3.0 software is used to process the data through the analysis of the average square. The test results show that design, management, resources, and environment affect the quality of construction project implementation performance by 94.40 percent; Outside of the study, this influence was 5.60 percent. With an initial sample value (O) of 0.401, management was the most influential rework factor on the quality of project execution performance, compared to 0.226 for design, 0.261 for resources, and 0.222 for the environment. Therefore, contractors must have the ability to improve management functions during the construction project execution process so that they can reduce the amount of work that has to be done again at a later date.


Keywords: Rework, The Causes of Rework, Quality of Project Implementation Performance, Partial Least  Squares, Contractor.
Aghivirwiati, Gusti Ayu, SH, M. M., Poniah Juliawati, A., Thorman Lumbanraja, S. E., Ps, C., Nanang Qosim, S. E., Sofyanty, Devy, Dewiningrat, Ayu Indira, SE, M. M., & Kismanto, Joko. (2022). Manajemen Kualitas. Cendikia Mulia Mandiri.
Ama, Adrianus Tamo. (2021). Analisis Proyeksi Biaya Dan Waktu Pelaksanaan Proyek Konstruksi Dengan Metode Earned Value Management (Studi Kasus: Proyek Rehabilitasi Jalan Dan Pembangunan Jembatan Siangan-Lokasrana). Universitas Mahasaraswati Denpasar.
Arini, Luthfa. (2021). Analisis Faktor-Faktor Penyebab Rework Pada Pekerjaan Konstruksi Di Kota Medan. Juripol (Jurnal Institusi Politeknik Ganesha Medan), 4(1), 47–60.
Dalvin, Achmad. (2021). Konstruksi Sosial Zero Waste: Studi Kasus Pada Masyarakat Kelurahan Ballaparang Kecamatan Rappocini di Kota Makassar. Universitas Hasanuddin.
Devi, Kharisma. (2021). Analisis Dan Evaluasi Sisa Material Konstruksi Pada Proyek Pembangunan Gedung Kuliah 4 Lantai Universitas Muhammadiyah Riau. Universitas Islam Riau.
Ervianto, Wulfram I. (2005). Manajemen proyek konstruksi edisi revisi. Yogyakarta: Andi.
Flegon, Filemon, Sari, Sely Novita, & Hermawan, Anggi. (2021). Analisis Faktor Penyebab Pekerjaan Ulang (Rework) Pada Proyek Bangunan Gedung di Daerah Istimewa Yogyakarta. EQUILIB, 2(1), 67–76.
Gaspersz, Vincent. (1997). Manajemen kualitas: penerapan konsep-konsep kualiutas dalam: manajemen bisnis total. Gramedia.
Hair Jr, Joseph F., Hult, G. Tomas M., Ringle, Christian M., Sarstedt, Marko, Danks, Nicholas P., & Ray, Soumya. (2021). Partial least squares structural equation modeling (PLS-SEM) using R: A workbook. Springer Nature.
Herdianto, Ardhan, Tanjungsari, Ayunda Dewi Ratih, Hidayat, Arif, & Hatmoko, Jati Utomo Dwi. (2015). Evaluasi Pengerjaan Ulang (Rework) pada Proyek Konstruksi Gedung di Semarang. Jurnal Karya Teknik Sipil, 4(1), 93–106.
Kurniawan, Anggi, & Martadisastra, Dedie S. (2022). Pengaruh manajemen kualitas total dan manajemen pengetahuan terhadap kinerja organisasi pada perusahaan property. KINERJA, 19(2), 277–285.
Sandyavitri, Ari. (2009). Manajemen Resiko di Proyek Konstruksi. Media Komunikasi Teknik Sipil, 17(1), 23–38.
Seprizal, Seprizal. (2022). Analisis Faktor-Faktor Penyebab Rework Pada Proyek Konstruksi Gedung Di Kota Payakumbuh. UNIVERSITAS MUHAMMADIYAH SUMATERA BARAT.
Setiawan, Abdi. (2021). PENGARUH MANAJEMEN PROYEK TERHADAP EFEKTIVITAS PENGELOLAAN PROYEK PADA DINAS PERUMAHAN DAN KAWASAN PERMUKIMAN KABUPAN KUTAI TIMUR. JAP: Jurnal ADMINISTRASI PUBLIK, 4(1), 232–252.
Sudiantara, I., Yuni, Ni Kadek Sri Ebtha, & Yuliana, Ni Putu Indah. (2023). Analisis Biaya Akibat Rework Pada Proyek Pembangunan Hotel Uluwatu. Politeknik Negeri Bali.
Usboko, Gregorius Pius, & Henong, Sebastianus Baki. (2022). ANALISIS FAKTOR-FAKTOR PENYEBAB PEKERJAAN ULANG (REWORK) PADA PROYEK KONSTRUKSI BANGUNAN GEDUNG DI KOTA KUPANG. JURNAL TEKNIK SIPIL CENDEKIA (JTSC), 3(1), 267–277.
Yakup, Anggita Permata. (2019). Pengaruh Sektor Pariwisata terhadap Pertumbuhan Ekonomi di Indonesia. Universitas Airlangga.