Perbaikan Nilai Overall Equipment Effectiveness dengan Metode Total Productive Maintenance pada PT. Electric Vehicle Trimotorindo
Main Article Content
This research was conducted to increase the Overall Equipment Effectiveness (OEE) value at PT Electric Vehicle Trimotorindo, which is an electric vehicle manufacturing company. The main problem faced by the company is the decline in OEE value every month due to lack of machine maintenance and deterioration in production quality. The method used in this study is Total Productive Maintenance (TPM), which involves identifying the factors that cause production losses through the analysis of Six Big Losses. The results show that the OEE value has increased from 78.61% to 80.36% after improvements through TPM, especially in increasing the quality rate from 88.48% to 92.23%. The conclusion of this study is that the application of TPM can improve the effectiveness of machine use and production quality, which ultimately contributes to the improvement of the company's productivity.
Cho, M.-K., & Kim, M. Y. (2024). Effectiveness of simulation-based interventions on empathy enhancement among nursing students: a systematic literature review and meta-analysis. BMC Nursing, 23(1), 319. https://doi.org/10.1186/s12912-024-01944-
Gianfranco, J., Taufik, M. I., Hariadi, F., & Fauzi, M. (2022). Pengukuran Total Productive Maintenance (Tpm) Menggunakan Metode Overall Equipment Effectiveness (Oee) Pada Mesin Reaktor Produksi. Jurnal Lebesgue: Jurnal Ilmiah Pendidikan Matematika, Matematika Dan Statistika, 3(1), 160–172.
Mitra, A. (2016). Fundamentals of quality control and improvement. John Wiley & Sons.
Mulyo, A. E. (2018). PENERAPAN TPM DENGAN MENGGUNAKAN OVERALL EQUIPMENT EFECTIVENESS (OEE) DAN SIX BIG LOSSES PADA MESIN REVERSE OSMOSIS DI BAGIAN UTILITY PT. WIDATRA BHAKTI. Universitas Yudharta.
Nusraningrum, D., & Arifin, Z. (2018). Analysis of Overall equipment effectiveness (OEE) on engine power plant performance. KnE Social Sciences.
Oematan, A., Sasmito, C., & Budi, P. (2020). Fenomena dan Realitas Sistem Pelayanan Publik Berbasis E-Government di Kota Batu (Studi Kualitas Pelayanan Sistem Informasi BATT Kota Batu). Fakultas Ilmu Sosial dan Ilmu Politik Universitas Tribhuwana Tunggadewi.
Peng, H., & Zhu, Q. (2017). Approximate evaluation of average downtime under an integrated approach of opportunistic maintenance for multi-component systems. Computers & Industrial Engineering, 109, 335–346.
Poduval, P. S., Pramod, V. R., & VP, J. R. (2015). Interpretive structural modeling (ISM) and its application in analyzing factors inhibiting implementation of total productive maintenance (TPM). International Journal of Quality & Reliability Management, 32(3), 308–331.
Rana, S., & Belokar, R. M. (2017). Quality improvement using FMEA: A short review. International Research Journal of Engineering and Technology, 4(6), 263–267.
Ridloi, M., & Jakaria, R. B. (2021). Totaliproductive Maintenance (Tpm) Analysis Using the Overall Equipment Effectiveness (Oee) Method and Six Big Losses on an Injection Molding Machine. Procedia of Engineering and Life Science, 1(2).
Rinawati, D. I., & Dewi, N. C. (2014). Analisis Penerapan Total Productive Maintenance (TPM) Menggunakan Overall Equipment Efectiveness (Oee) Dan Six Big Losses Pada Mesin Cavitec Di PT. Essentra Surabaya. Prosiding Snatif, 21–26.
Septian, J. A. D. I., Mandagie, K. L., & Bhirawa, W. T. (2021). Analisis Sistem Pemeliharaan Pada Mesin Mounter Chip Menggunakan Perhitungan Overall Equipment Effectiveness (OEE) di PT. Dharma Anugerah Indonesia. Jurnal Teknik Industri, 10(1).
Sibarani, A. A., Muhammad, K., & Yanti, A. (2020). Analisis Total Productive Maintenance Mesin Wrapping Line 4 Menggunkan Overall Equipment Effectiveness dan Six Big Losses di PT XY, Cirebon-Jawa Barat. Jurnal Rekayasa Sistem & Industri (JRSI), 7(02), 81–87.
Sukmana, A. F., Pamoso, A., & Rachmat, H. (2021). Perencanaan Program Pemeliharaan Pada Mesin Pengolah Gula Semut Menggunakan Metode Fmea Dan Fc3r Maintenance Di Pesantren At-taqwa Tasikmalaya. EProceedings of Engineering, 8(5).
Wahid, A. (2020). Penerapan total productive maintenance (TPM) Produksi Dengan Metode overall equipment effectiveness (OEE) Pada proses produksi botol (pt. XY pandaan–pasuruan). Jurnal Teknologi Dan Manajemen Industri, 6(1), 12–16.