Perjanjian Jasa Pemborongan Pekerjaan Pembangunan Jalan Tol Jakarta-Cikampek II Elevated Ditinjau dari Peraturan Perundang-Undangan di Indonesia

Main Article Content

Iwan Dewantoro
Universitas Tama Jagakarsa, Indonesia
Sufiarina Sufiarina
Universitas Tama Jagakarsa, Indonesia
Riana Wulandari Ananto
Universitas Tama Jagakarsa, Indonesia

The research was conducted with the aim of evaluating the extent to which the clauses in the Design and Build Agreement on the Jakarta-Cikampek II Elevated Toll Road Construction Project are in accordance with the provisions of laws and regulations governing construction services and procurement of goods/services. The research applies the empirical juridical method as a research approach, which is an approach used to analyze the extent to which a regulation or law is effectively applied in society. The data used in this research is primary data, namely data obtained directly from the source in the field, either through observation or informal documents which are then processed by researchers. In this research, primary data is obtained through observation and documents from PT Jasamarga Jalanlayang Cikampek as a Service User and Waskita-Acset KSO as a Service Provider. The results of the study concluded that the Design and Build Agreement Clause for the Construction of the Jakarta-Cikampek II Elevated Toll Road has fulfilled the provisions of Law Number 2 of 2017 concerning Construction Services, but the clause regarding changes to the Contract or Contract Addendum does not meet the provisions of Presidential Regulation Number 54 of 2010 Article 87 paragraph (1).


Keywords: Agreement, Construction Services, Construction Work, Toll Road
Abdullah, Z. (2018). Analisis Pengaruh Keselamatan dan Kesehatan Kerja (K3) Terhadap Kinerja Pekerja Konstruksi (Studi Kasuss Proyek The Manhattan Mall & Condominium). TERAS JURNAL: Jurnal Teknik Sipil, 8(1), 329–338.
Marlina, L., Endaryanto, T., & Hijriani, A. (2021). Analisis Perubahan Penggunaan Lahan Pertanian Akibat Pembangunan Jalan Tol Berbasis Citra Satelit Di Kabupaten Lampung Selatan. Journal of Food System and Agribusiness, 5(1), 11–18.
Prabowo, V. S., & Sandora, R. (2017). Analisis Identifikasi Bahaya Pada Proyek Pembangunan Jalan Tol, Dengan Metode HIRARC dan Solusi Alternatif Menggunakan Benefit Cost Analysis (BCA). Conference on Safety Engineering and Its Application, 1(1), 171–175.
Prasetya, G. (2019). Pelaksanaan Jaminan Kecelakaan Kerja Dan Jaminan Kematian Terhadap Pekerja Jasa Konstruksi Pada PT Fajar Berdasi Gemilang Berdasarkan Peraturan Menteri Ketenagakerjaan Nomor 44 Tahun 2015 Di Kota Pekanbaru. Universitas Islam Riau.
Rahmawati, N., & Tenriajeng, A. T. (2020). Analisis Manajemen Risiko Pelaksanaan Pembangunan Jalan Tol (Studi Kasus: Proyek Pembangunan Jalan Tol Bekasi-Cawang-Kampung Melayu). Rekayasa Sipil, 14(1), 18–25.
Riyanto, A., & Joesoef, I. E. (2020). Penugasan Badan Usaha Milik Negara Dalam Pengusahaan Jalan Tol: Studi Penugasan Pt. Hutama Karya (Persero) Dalam Pengusahaan Jalan Tol Di Sumatera. National Conference on Law Studies (NCOLS), 2(1), 344–379.
Safira, A., an Chandrawulan, A., & Faisal, P. (2021). Pelaksanaan Kontrak Kerja Konstruksi Selama Pandemi Covid-19 Berdasarkan Perspektif Hukum Indonesia. Doctrinal, 6(2), 123–137.
Sanjaya, I. K. A. (2019). Pengelolaan Limbah Konstruksi Pada Proyek Pembangunan Di Bali. Seminar Nasional Arsitektur, Budaya Dan Lingkungan Binaan (SEMARAYANA), 135–140.
Soekiswara, T. E. F. (2024). Faktor Kecelakaan Dan Keselamatan Kerja Pada Penggunaan Crane Di Proyek Konstruksi. Menara: Jurnal Arsitektur Dan Teknik Sipil, 12(1), 42–50.
Tanjung, S. M., Fahira, J. R., Walid, M., Syahputra, D., & Simamora, I. Y. (2024). Pemanfaatan Pembangunan Sistem Pengelolaan Air Minum (SPAM) Regional Mebidang pada Masyarakat di Jalan Medan-Binjai Say. El-Mal: Jurnal Kajian Ekonomi & Bisnis Islam, 5(1), 523–529.
Tigauw, F. M. Z., & Aprilianto, F. (2020). Jasa Pemborongan Pekerjaan Pembangunan Jalan Tol Tebing Tinggi–Parapat (Tahap I) Ruas Tebing Tinggi–Serbelawan (STA 0+ 000–30+ 000) Termasuk Simpang Susun Sebelawan (Lanjutan)(lokasi: LM2023TKJJ18-25).
Urrahmi, M., & Putri, N. E. (2020). Manajemen Konflik Pengadaan Tanah Pembangunan Jalan Tol Padang-Sicincin. Jurnal Manajemen Dan Ilmu Administrasi Publik, 2(2), 9–17.
Wauran, R. V. (2020). Kepastian Hukum Perjanjian Secara Lisan Menurut Kuhperdata Pasal 1338. Lex Privatum, 8(4).
Wijaya, I., & Yudhistira, M. H. (2020). Dampak Pembangunan Jalan Tol Trans Jawa terhadap Perekonomian Daerah Kabupaten/Kota. Jurnal Kebijakan Ekonomi, 15(2), 8.
Yalina, F., & Sugiri, T. (2021). Pengaruh Implementasi Sistem Manajemen Keselamatan Konstruksi Terhadap Kinerja Proyek Pembangunan Flyover (Studi Kasus: Flyover Sultan Agung Tanjung Karang). Techno-Socio Ekonomika, 14(2), 87. https://doi.org/10.32897/techno.2021.14.2.664